Baxi Eco 3 Servisní příručka

Procházejte online nebo si stáhněte Servisní příručka pro Ohřívače vody a bojlery Baxi Eco 3. Baxi Eco 3 Technical data [en] Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk

Shrnutí obsahu

Strany 1 - Baxi Combi 80Eco

Baxi Combi 80Eco Gas Fired Wall Mounted Combination BoilerInstallation and Servicing InstructionsPlease leave these instructions with the user

Strany 2 - Natural Gas

StopValveDoubleCheckValveDHWMainsInletCHReturnTemporaryHose6.0 System Details106.5 System Filling and Pressurising1. A filling point connection on the

Strany 3 - Contents

6.0 System Details116.8 Domestic Hot Water Circuit1. All DHW circuits, connections, fittings, etc.should be fully in accordance with relevantstandards

Strany 4 - 1.0 Introduction

7.0 Site Requirements127.1 Information1. The installation must be carried out by a CORGIRegistered Installer or other registered competentperson and b

Strany 5 - 2.0 General Layout

7.0 Site Requirements137.5 Ventilation of Compartments1. Where the appliance is installed in a cupboardor compartment, no air vents are required.2. BS

Strany 6 - 3.0 Appliance Operation

7.0 Site Requirements14Fig. 167.8 Flue1. The flue terminal position must be inaccordance with the current editions of B.S.5440 Part 1, and either Part

Strany 7 - 4.0 Technical Data

7.0 Site Requirements157.9 Flue DimensionsThe standard horizontal flue kit allows for fluelengths between 100mm and 1metre from elbowto terminal (Fig.

Strany 8 - Dimensions

167.0 Site Requirements7.12 Flue Options1. The Baxi Combi 80Eco can be fitted with fluesystems as illustrated. 2. The standard flue is suitable only f

Strany 9

8.0 Installation178.1 Initial PreparationThe gas supply, gas type and pressure mustbe checked for suitability before connection(see Section 7.6).1. Af

Strany 10 - 6.0 System Details

8.0 Installation188.4 Fitting The Boiler1. Lift the boiler using the lower edges. Engagethe slots at the top rear of the boiler on the wallplate hooks

Strany 11

8.0 Installation198.6 Fitting The FlueHORIZONTAL FLUE1. The standard flue is suitable for lengths100mm minimum to 1m maximum (measuredfrom the edge of

Strany 12 - 7.0 Site Requirements

2Baxi UK Limited is one of the leading manufacturersof domestic heating products in the UK. Our first priority is to give a high quality service to o

Strany 13 - IRING REGULATIONS

8.0 Installation208.6 Fitting the Flue (Cont)IMPORTANT: If the equivalent flue length isgreater than 1.5m the restrictor MUST beremoved from the adapt

Strany 14

8.0 Installation218.7 Making The Electrical ConnectionsTo connect the mains input cable proceed asfollows:-1. Slacken the facia securing screws and li

Strany 15

9.0 Commissioning the Boiler229.1 Commissioning the Boiler1. Reference should be made to BS 5449 Section5 when commissioning the boiler. 2. Open the m

Strany 16

9.0 Commissioning the Boiler239.2 Checking the Burner Pressure1. Turn on the gas and electrical supplies to theboiler and ensure that all external con

Strany 17 - FIXING TEMPLATE

10.0 Completion2410.1 Completion1. Hinge the facia panel upwards and refit thecase front panel. Secure them with the screwspreviously removed (Fig. 45

Strany 18 - 4 in valve with

11.0 Servicing the Boiler2511 .1 Annual Servicing1. For reasons of safety and economy, it isrecommended that the boiler is serviced annually.Servicing

Strany 19 - 8.0 Installation

11.0 Servicing the Boiler2611.1 Annual Servicing (Cont)10. Remove the spring clips retaining the air boxside baffle plates. Disengage the tabs on theb

Strany 20

12.0 Changing Components27IMPORTANT: When changing componentsensure that both the gas and electricalsupplies to the boiler are isolated before anywork

Strany 21

12.0 Changing Components2812.3 Heat Exchanger (Fig. 62)1. Note the positions of the two sensing tubes onthe outlet elbow and three wires on the fan mo

Strany 22 - 9.0 Commissioning the Boiler

12.0 Changing Components2912.5 Injectors (Fig. 64)1. Remove the burner as described in Section12.4.2. Undo the screws securing the injectormanifold to

Strany 23

31.0 Introduction 42.0 General Layout 53.0 Appliance Operation 64.0 Technical Data 75.0 Dimensions and Fixings 86.0 System Details 97.0 Site Requireme

Strany 24 - 10.0 Completion

12.0 Changing Components3012.8 Gas Valve (Fig. 66)1. Undo the nut on the gas feed pipe at the tap railunder the boiler.2. Remove the securing screws a

Strany 25 - 11.0 Servicing the Boiler

12.0 Changing Components3112.11 Pump - Head Only (Figs. 68 & 69)1. Drain the primary circuit and remove thesocket head screws securing the pump he

Strany 26

12.0 Changing Components3212.14 Pressure Gauge 1. Drain the primary circuit and undo the nut onthe pressure gauge capillary (Fig. 71).2. Remove th

Strany 27 - 12.0 Changing Components

12.0 Changing Components3312.17 Pressure Relief Valve (Fig. 78)1. Drain the primary circuit.2. Disconnect the discharge pipe from the valve.Using a su

Strany 28

12.0 Changing Components3412.20 Plate Heat Exchanger (Fig. 81)1. Drain the primary circuit.2. While supporting the heat exchanger undo thescrews secur

Strany 29

12.0 Changing Components3512.21 Diverter Valve Assembly (Cont)Pressure Differential Valve (Fig. 84)1. Remove the pressure differential valve asdescrib

Strany 30

13.0 Illustrated Wiring Diagram36Optional TimersPumpGas ValveAir Pressure SwitchSafety ThermostatHydraulic DifferentialPressure SwitchTemperature Sens

Strany 31

14.0 Fault Finding37Carry out initial fault finding checks1. Check that gas, water and electrical supplies are available at the boiler. Electrical sup

Strany 32

14.0 Fault Finding38Domestic Hot Water - Follow operational sequenceTurn selector to neon illuminatedPrimary flow switchoperatedFan runs at max sp

Strany 33

14.0 Fault Finding39Fault Finding Solutions Sections A to EIs there 230V at:Is there 230V at:Main terminals L and N Check electrical supply1.NOMain te

Strany 34

Baxi UK Limited declare that no substancesharmful to health are contained in theappliance or used during appliancemanufacture.1.1 Description1. The Ba

Strany 35

14.0 Fault Finding40Check and correct if necessary1. Electrical and pressure tube connections2. Blockage of pressure tubes3. Restriction in flue4. Ven

Strany 36 - Control PCB

14.0 Fault Finding41Check and correct if necessary1. Flame sensing electrode and lead connections2. Electrode positionFlame current should be 1 µA app

Strany 37 - 14.0 Fault Finding

15.0 Short Parts List42Short Parts ListKey G.C. Description ManufacturersNo. No. Part No.22 E66 383 Fan 24800123 393-497 Pressure Switch 2

Strany 38

43Baxi UK Limited manufacture a comprehensive rangeof products for the domestic heating market.Gas Central Heating Boilers(Wall, Floor and Fireside mo

Strany 39

Baxi UK LimitedBrownedge RoadBamber Bridge PrestonLancashirePR5 6SNwww.baxi.comAfter Sales Service08706 096 096Technical Enquiries08706 049 049Comp No

Strany 40

2.0 General Layout52.1 Layout1. Air Pressure Switch2. Expansion Vessel3. Burner Manifold4. Automatic Air Vent5. DHW Plate Heat Exchanger6. Circulation

Strany 41

3.0 Appliance Operation6NOTE: All delay timers mentioned in 3.1 and3.2 are overridden by domestic hot waterdemand.3.1 Central Heating Mode (Fig. 4)1.

Strany 42 - 15.0 Short Parts List

4.0 Technical Data7Flue Terminal Diameter 100mmDimensions Projection 95mmOutercase DimensionsCasing Height - 780mmOverall Height Inc FlueElbow - 980mm

Strany 43

5.0 Dimensions and Fixings8DimensionsA 780mmB 345mmC 450mmD 107mm Ø Min.E 200mmF 190mmG 143mm360° Orientation Tube Ø 100mmDCBAEGF65mm 65mm 65mm 65mmWa

Strany 44 - 08706 049 049

6.0 System Details96.1 Information1. The Baxi Combi 80Eco Combination Boiler is a‘Water Byelaws Scheme - Approved Product’.To comply with the Water By

Komentáře k této Příručce

Žádné komentáře